Counters & compare
Count parts into a batch, track stock, fill a car park. Counters count edges, compare instructions turn numbers back into on/off decisions. Together with the last four modules they complete the ladder toolkit for most simple machines.
By the end of this module you can
- Use count-up (CTU) and count-down (CTD) counters with preset, reset and load
- Read a counter's current value and done bit
- Use compare instructions (=, <>, <, >, <=, >=) in rungs
- Count up and down with one value
- Set counters up in Siemens, Rockwell, Mitsubishi and Logivyx, including Rockwell's different CTD behaviour
A CTU adds 1 to its current value CV on each rising edge of its count input (it detects the edge itself, so no one-shot is needed). When CV reaches the preset PV, output Q turns on. The reset input R sets CV back to 0.
Note step 3: a CTU keeps counting past the preset. If extra parts must be rejected or the conveyor stopped, the program has to do that using Q.
A CTD subtracts 1 on each rising edge of its count input. The load input LD copies the preset PV into CV. In IEC, Q turns on when CV reaches 0 or below. Here: a magazine holds 6 caps; each cap used counts down; at 0 the "refill" lamp lights.
A compare element tests two values and passes power if the test is true. One side is usually a tag, the other a tag or a constant. Use them for limits, step numbers, counts and analog thresholds.
| Test | IEC / Logivyx | Siemens LAD | Rockwell | Mitsubishi |
|---|---|---|---|---|
| equal | = | CMP == | EQU | LD= |
| not equal | <> | CMP <> | NEQ | LD<> |
| greater | > | CMP > | GRT | LD> |
| greater or equal | >= | CMP >= | GEQ | LD>= |
| less | < | CMP < | LES | LD< |
| less or equal | <= | CMP <= | LEQ | LD<= |
| in range | (a >= lo) AND (a <= hi) | IN_RANGE | LIM | two compares |
>= over = when a value can jump past the target, e.g. a fast count or an analog value. "Level = 80.0 %" may never be exactly true; "Level >= 80.0 %" will be.A car park counts cars in and out. IEC has a CTUD block for this; many PLCs too. The Logivyx Ladder Designer offers CTU and CTD, so here we use one DINT tag with edge contacts and Raw ST actions, which works on any PLC.
C_Batch(CU := Part_PE, R := Reset_PB, PV := 5); Batch_Full := C_Batch.Q; Batch_Count := C_Batch.CV; // CTUD: CU, CD, R, LD, PV → QU, QD, CV
IEC: CTU (CU, R, PV → Q, CV), CTD (CD, LD, PV → Q when CV ≤ 0), CTUD. Logivyx Ladder Designer: Counter (CTU/CTD) with Instance name, Type, Preset value, Reset tag (R for CTU, LD for CTD) and ACC Tag, a real tag that receives CV every scan so screens and compares can use it. Compare: Compare element with Value A, Operator, Value B (tag or literal).
"C_Batch_DB"
+-------+
"Part_PE" | CTU |
--| |------|CU Q|------( "Batch_Full" )
"Reset_PB"-|R |
5 -|PV CV|- "Batch_Count"
+-------+
S7-1200/1500 IEC counters CTU, CTD (CD, LD, PV), CTUD, each with an instance DB; choose the data type (Int, DInt…). Compare with CMP ==, <>, >, >=, <, <= contact boxes, plus IN_RANGE / OUT_RANGE. S7-300/400 also have S5 counters (S_CU, S_CD, S_CUD, max 999).
XIC Part_PE CTU C_Batch 5 0 XIC Reset_PB RES C_Batch XIC C_Batch.DN OTE Batch_Full GEQ C_Batch.ACC 3 XIO C_Batch.DN OTE Nearly_Full
Studio 5000 CTU and CTD share a COUNTER tag: .PRE, .ACC, .CU, .CD, .DN, .OV, .UN. Reset with a separate RES rung. Watch out: .DN is set when .ACC ≥ .PRE for both CTU and CTD, unlike the IEC CTD whose Q means "reached zero". A CTD on the same tag as a CTU gives up/down counting. Compares: EQU, NEQ, GRT, GEQ, LES, LEQ, LIM, CMP.
LD X0 OUT C0 K5 ; count rising edges of X0, set value 5 LD X1 RST C0 ; reset LD C0 OUT Y0 ; batch full LD>= C0 K3 ; compare contact ANI C0 OUT Y1 ; nearly full
Counter devices C count up on each rising edge of the coil; the C0 contact closes when the count reaches the set value; reset with RST C0. Long counters LC hold 32-bit values. Up/down counting uses UDCNT instructions or the IEC CTUD FB. Compare contacts: LD=, AND>, OR<=… and D prefixes for 32-bit (LDD>=).
Use PLC_Trainer. PB1 = part sensor, PB2 = reset, SW1 = conveyor run switch, Q1 = conveyor, Q2 = nearly full, Q3 = batch full, N1 = count.
L09_Batch
- New ladder routine
L09_Batch. Rung 1: XICPB1→ Counter, Instance nameC_Batch, Type CTU, Preset value 6, Reset tagPB2, ACC TagN1. - Rung 2: Function Block Bit
C_Batch.Q → OTEQ3. - Rung 3: Compare
N1 >= 4, XIOQ3→ OTEQ2. - Rung 4: XIC
SW1, XIOQ3→ OTEQ1. The conveyor stops when the batch is full. - Call
L09_BatchfromMain, save, F5. Count to 6 and check Q2, then Q3 and the conveyor stop. Reset with PB2. - Extension: change the counter to CTD with Preset 6 and the same Reset tag. What does PB2 do now, and when does Q turn on? Adjust rungs 3 and 4 so the lab still works.